Senior Site Engineer - Dublin
Manages the engineering function as the senior representative, co-ordinates with the line manager and provides Engineering Leadership for their respective project. Sets the strategy for Engineering setting out and onsite control, along with the (Engineer/Assistant Engineer) and subordinates/supply chain. Is the primary point of reference for QA, record keeping and production ensuring the establishment and maintenance of the Sisk Quality procedures and requirements. Also takes responsibility for Temporary Works Control/Co-ordination and where required actively manages lifting operations.
Responsibilities
1. Competent and demonstrates advanced awareness in the best forms of dimensional control and is comfortable in rotating global grids into local grid format
2. Ensures that site and graduate engineers take responsibility for the management of survey equipment
3. Ensures that the engineering team completes as-built surveys for key elements. Understands key tolerances and can analyse details across a number of interfaces to highlight potential problems
4. Completes an individual daily diary
5. Competent in the principles of quality control for the majority of packages. Can review and create
6. Inspection & Test Plans. Can readily display advanced knowledge of key packages such as concrete, drainage, steelwork and brickwork
7. Has a good awareness of the project specifications, in particular tolerances for vertical and horizontal structural elements
8. Controls the components of the SISK Non-Conformance procedure.
9. comfortable in creating and closing out Non-Conformances.
10. Understands the cost of defects and remedial works.
11. Works actively to close out NCRs in a timely manner
12. competent in the issuing of “Permits to break ground”
13. Can review and create method statements and risk assessments
14. Identifies where information is missing and has an excellent working knowledge of the project RFI process
15. Undertakes the role of the Temporary Works Co-ordinator (When appointed) and ensures the Sisk
16. Temporary Works procedures are implemented for both direct and subcontracted works
17. Undertakes the role of Project Lifting Operations Appointed Person (When appointed)