Electrical / I&C Supervision
The mission is to work within the TK/SI Installation Field Operation organization, reporting to the TK/SI Installation Leader, the site Construction Manager, and the Electrical/I&C Coordinator. The service consists of taking charge of the electrical & instrumentation installation of the shaft line equipment & associated auxiliaries in open & combined cycle plant configuration following GE compliance and in accordance with the EHS & quality standards, the schedule, and the budget.
Drawings, procedures of assembly, and associated documents are made in English; reports listed below will be made in English.
Mission description
In particular, the mission consists of:
* Review cable ducts & cable trenches civil work, steel structure against drawing & specifications.
* Verify qualifications of electrical personnel and conformity of tools used.
* Anticipate, coordinate & drive activities with the partner (plan of day, weekly objectives…)
* Supervise electrical assembly of Generator if delivered disassembled, excitation collector, bushing.
* Perform Generator insulation test & record resistance value; power up space heaters.
* Supervise instruments, motors, junction boxes installation and electrical cable pulling & termination on GT, ST, Generator, associated auxiliaries and inside electrical & controls cubicles.
* Verify ATEX installation compliance.
* Supervise electrical BOP equipment installation (bus duct, circuit breaker, transformer…)
* Provide recommendations on installation technique, tools, resources.
* Communicate & manage engineering change notice, TIL. Ensure execution and report closure.
* Supervise cable insulation testing, cold loop check.
* Prepare electrical system’s pre-commissioning before energizing & support commissioning.
* Participate in installation schedule progress review.
* Participate in site coordination meetings.
* Participate and provide input to RFR with information required.
* Assist commissioning team in troubleshooting.
Deliverables
* Perform detailed material inventory of GE supplied material against packing list & drawings.
* Perform Generator insulation test & record resistance value; power up space heaters.
* Provide technical issues resolution with GE engineering using PAC and follow up action plan.
* Order missing or damaged material and follow up material requests.
* Document quality plan & inspection sheets timely and follow up red marked-up documentation.
* Attend systems walk down for turnover to commissioning, follow up punch list item resolution.
* Document installation means (personnel man-hours per discipline, …) utilized as baseline for future project execution budgeting purposes.
* Document extra works, approve time sheets, report cost of non-quality with GE tools (Documentum, Engineering Request, POS).
* Issue progress report to Site Management.
* Issue end of assignment report and edit Lessons Learned.
#J-18808-Ljbffr